Announcement of the production capacity replacement plan of Shanxi Tai Steel Stainless Steel Company

Author:Maktech View:118 Time:2022-06-16 16:15:47

According to the requirements of the \"Guiding Opinions of the State Council on Resolving the Contradictions on Evergreen Capacity\", \"Opinions on the Development of the State Council on the Development of the Settlement of Solving Solving Evergreen\", and the \"Implementation Measures for the Implementation of the Capacity Replacement of the Iron and Steel Industry\" of the Ministry of Industry and Information Technology, through Taiyuan City The ICBC Audit and Expert Qi Check and other working procedures, the Shanxi Provincial Department of Industry and Information Technology will publicize the production capacity replacement plan of Shanxi Taosteel Stainless Steel Co., Ltd. to optimize the product structure of Shanxi Taosteel Stainless Steel Co., Ltd. The period is from May 30 to June 27, 2022.

Construction project situation

Construction

] Location

Switching equipment

It is planned to start

Purchase time

Replacement

Remarks

]

Category (turntable/electric furnace/AOD furnace, etc.)

Model (volume/capacity, etc.)

Unit (ton) [ 123]

Device

Number

Construction capacity (10,000 tons/year)

]

Shanxi Tai Steel Stainless Steel Co., Ltd.

No. 2, Jiaoya Street, Taiyuan City, Shanxi Province

Electric furnace [123 ]

90

ton

1

70

August 2022

April 2024

1: 1

Internal relocation technology renovation project

supporting construction 1 -seat processing device, 1 130 tons of AOD furnace, 130 tons of LF refining furnace [123 ]

Exit project situation

Serial number

]

Enterprise Name

Switching equipment

Start demolition time

] Removal time

Remarks

Category (turntable/electric furnace/AOD furnace, etc.)

]

Model (volume/capacity, etc.)

Unit (ton)

Number of devices

Exit capacity (10,000 tons/year)

Taiyuan City, Shanxi Province

[ Shanxi Tai Steel Stainless Steel Co., Ltd.

Electric furnace

90

ton

1

70

Before the project was completed and put into production (when the electric furnace body was relocated)

[

123] Before the project was completed and put into production (when the relocation electric furnace was completed)

Internal relocation technology reconstruction project (at the same time removing 3 45 -ton AOD furnaces)

]